DOWNTOWN SEATTLE / GUIDE
Plumbing Inspection Record
Keep work visible when the current official process requires inspection before covering.
PRACTICAL GUIDE
Prepare work for inspection
Connect permit, inspection type, visible work, responsible contact, result, corrections, and final status.
Record the request, date, inspector or agency, result, correction, reinspection, and final evidence.
Record the result without guessing
Keep the permit number, approved scope, plans, changes, installation locations, product information, concealed-work photographs, requested inspection, scheduled access, and responsible contacts together. After the inspection, preserve the official result, correction items, reinspection route, and closeout documents exactly as issued.
A provider test is not automatically the official inspection record.